Installation

The right crew on the roof.

We hold relationships with strong regional EPCs rather than one national contractor, so every project is built by a crew that knows the local building department and the local utility. We manage them. You do not.

Why regional, not national

A commercial solar and storage project is permitted by a county, inspected by a city, and interconnected by a specific utility with its own engineers and its own paperwork. A crew that has done a dozen projects in that jurisdiction knows which inspector wants what, which utility reviewer is slow, and where the local fire marshal stands on battery siting. A national contractor flying in a crew learns all of that on your project.

We keep a bench of regional EPCs — engineering, procurement and construction firms — that we have vetted for licensing, insurance, safety record, storage experience and financial health. For each project we invite the two or three that fit the building and the state, and they bid on the same specification.

One owner. Many jurisdictions. One phone call.

Own buildings in six states and you have six building departments, six utilities and six interconnection queues — which is exactly why the regional bench matters. You don't manage six contractors; you manage us. We run the right local crew in each market, on one standard specification, and give you a single rollout schedule across the whole portfolio.

The crew changes at the state line. Your point of contact doesn't.

How a portfolio program runs →

What we manage, start to finish

  1. 01
    Bid

    Like-for-like pricing from vetted regional EPCs on our specification.

  2. 02
    Contract

    Scope, schedule, milestones, warranties and change-order terms negotiated on your behalf.

  3. 03
    Permit

    Structural, electrical and fire permits; NFPA 855 documentation for the battery.

  4. 04
    Interconnect

    The utility application, engineering review and any upgrades, tracked to approval.

  5. 05
    Build

    Site supervision, milestone inspections, and sign-off before every payment.

  6. 06
    Commission & enroll

    Testing, monitoring go-live, and enrollment in the grid programs you qualified for.

What we ask of the installer

  • Licensed and insured in the state, with storage-specific experience
  • Documented safety program and incident record
  • Financial references — they will be holding your deposit
  • Manufacturer certification on the equipment we specified
  • Fixed price against our scope; changes go through us

What we ask of you

  • Roof and electrical-room access for the survey
  • A single point of contact at the facility
  • Sign-off at the milestones we set — you are never asked to approve work you cannot see
  • That is the list. Permits, utility calls, inspections and crew management are ours.
Start here · Free savings estimate

What would clean energy save your portfolio?

Send us the addresses and twelve months of bills. We model what solar and storage would remove from your power costs across the portfolio, and what the grid would pay you on top. Independent, no obligation.

or call 561-203-5495

Two-minute form. Reply within two business days. No quote, no guarantee, no tax advice.